How to prepare for a Design Sprint | #RELABLIFE ep.72

Relab Studios on YouTubeWatch on YouTube

SaveMark complete

Sign in to save videos and track what you’ve finished.

BeginnerDesign Sprint12 min

About this video

Alvin Hermanto, Agency Principal at Relab Studios, explains a set of preparation steps called The Preflight that set the stage before a week-long design sprint so teams form alignment and buy-in. It is a vlog from the Relab Studios series about the agency's process.

What you’ll learn

  • Set up the stage before a design sprint begins
  • Build team alignment and stakeholder buy-in ahead of the sprint