Tea Time with Mike: How to Tell Your Devs that Design is Finalized

Zeplin on YouTubeWatch on YouTube

SaveMark complete

Sign in to save videos and track what you’ve finished.

IntermediateDesign-Dev Collaboration3 min

About this video

Shows how designers publish a finished design to developers in Zeplin so they receive a locked, build-ready version instead of a changing file. Aimed at product designers who hand off work to engineering teams.

What you’ll learn

  • Publish a build-ready design to developers in Zeplin
  • Share a locked design so developers stop building from changing files
  • Set up a finalized handoff that keeps the whole product team aligned